Course contents

Unit 5: Onboarding and trustLesson 5.3 (3 of 10 in this unit)28 of 62 in the Cisco SD-WAN course

Onboard the Manager, Validator and Controller: production and lab

How the three controllers are built and made to trust one another: hosting choice, certificate method, adding each to the Manager, the edge list and the checks, with the lab version beside the production one.

Intermediate · 12 min read

You'll learn to onboard the Manager, the Validator and the Controller in order, choose a certificate method that fits the network, and say what the production process adds to the lab process.

Technical definition

Controller onboarding is the work of building the three control components and making them trust one another: the Manager first, then the Validator and the Controller added to it, each with an identity, a certificate from an authority all three trust and an entry the Manager recognises. There is no PnP route for them. They are built by your team, or by Cisco when the controllers are Cisco-hosted.

Three machines that cannot use PnP

A WAN Edge at a branch can be shipped to a site and find its controllers by itself. The controllers are the things it finds, so they cannot do the same. They are built once, with care, and everything else depends on them. There are two ways to get them: build them yourself, or buy them Cisco-hosted. In the second case Cisco builds the overlay from a portal request and sends the Manager details to the contact on the order, which is what Cisco's onboarding guide describes. The rest of this lesson is about building them yourself, because that is where the choices are.

Diagram
Who builds the controllers
Who builds the controllers

With on-premises controllers, your team builds and certifies the Manager, Validator and Controller. With Cisco-hosted controllers, Cisco builds the overlay from a portal request, and your team starts at the WAN Edge devices.

On-premisesYou deploy and certifyYou run and back up
Cisco-hostedCisco builds from a requestCisco runs them
Both end with the same three components. The difference is who does the work and who runs them.

The process in production

The table follows one production build from the order to the first check. Menu names change between releases, so it names the screen and the evidence rather than every click.

Diagram
The production build in four stages
The production build in four stages

The eight steps fall into four stages. First the accounts and the plan, then the Manager, then trust between the three controllers, and last the edge list and the checks before any router is cabled.

  1. 1-2 Planaccounts andwritten plan
  2. 3 Managerdeployed andset up
  3. 4-6 Trustcertificates onall three
  4. 7-8 Readyedge list,checks, backup
Each stage ends with evidence. Do not start the next stage without it.
Diagram
Production process for on-premises controllers
Production process for on-premises controllers
StepWhat you doEvidence it worked
1 AccountsConfirm the Smart Account and Virtual Account that match the purchase, and who has the administrator role on themYou can sign in to the portal and see the right Virtual Account
2 PlanFix the organization name, system IPs, site ID, the Validator address or name, DNS and NTP, and agree firewall rules with the network teamA written plan that every node's configuration matches
3 ManagerDeploy it, give it a transport address by console, sign in to the GUI and set the organization name and Validator address in the settingsGUI login works and the settings show the planned values
4 Certificate methodChoose Cisco PKI automated, Cisco PKI manual or enterprise CA, using the table belowThe settings show the method, and the root certificate is installed on the Manager
5 Validator and ControllerDeploy each, give it a base configuration, add it to the Manager with its transport address and credentialsEach node is listed on the Controllers page
6 CertificatesGenerate a signing request for each node, have it signed by the chosen authority and install the answerCertificate status is installed on all three
7 Edge listSync the Smart Account or upload the WAN Edge list, then send it to the controllersThe list shows devices as valid on the Validator and Controller
8 Check and back upRead the control connections on all three, then export a backup of the ManagerThree pairs connected, and a backup stored away from the Manager
Steps 7 and 8 come before any router is cabled. Production designs normally run more than one Controller and Validator for resilience.

Choosing the certificate method

The controllers authenticate one another with certificates, so the method has to be settled before step 6. Cisco's certificate guide, updated in December 2023, recommends Cisco PKI for the control components and describes three methods. The table gives the facts that decide between them. Version numbers and ports are what that guide states, so confirm them against the version you run.

Diagram
Certificate methods for the controllers
Certificate methods for the controllers
MethodUse it whenWhat it needsHow the request is signed
Cisco PKI, automatedThe Manager can reach Cisco's servicesManager 19.1 or later, DNS on the transport side, outbound HTTPS to Cisco hostsThe Manager sends the request, then retrieves and installs the signed certificate
Cisco PKI, manualThe Manager has no Internet accessManager 19.1 or later, and a workstation that can sign in to the PnP Connect portalYou copy the request into the portal, then upload the signed certificate
Enterprise root CACompany policy requires its own authority, or the Manager is olderA CA you control, with the root chain installed on the Manager first. The December 2023 guide does not list SCEP for the control components; newer guides (Manager 20.18.1) add EST and SCEP enrolment settings, so check your releaseYou sign each request with the CA and install the answer
Cisco stopped sponsoring Symantec and DigiCert certificates on 31 March 2023, and existing ones work until they expire. WAN Edge routers need to trust the same root when the enterprise method is used.
Diagram
Request, sign, install
Request, sign, install

Each method follows the same three actions. The Manager produces a signing request, an authority signs it, and the signed certificate is installed. The methods differ in who signs it.

  1. RequestManagermakes a CSR
  2. SignCisco PKIor your CA
  3. Installon eachcontroller
  4. Checkstatus installed
The three methods share the shape. Choose by who can sign and whether the Manager has the Internet.

In a lab the enterprise method is the usual choice, because a lab often has no Smart Account to sign against and the authority can be a small CA created for the exercise. Cisco's guide includes a lab example that uses OpenSSL. In recent releases the guide says the Manager passes changes in the enterprise root chain on to the Validator and the Controller. Older releases and many lab builds install the root on each node by hand, as the controller build lab does. Check with the root certificate command on each node rather than assuming.

The lab process, and what it leaves out

A lab goes through the same eight steps with different weights. The table shows what each step becomes. The full lab, with the configuration for each node, is in Install or build a controller-and-edge lab.

Diagram
Production step against lab step
Production step against lab step
StepProductionLab
AccountsSmart Account and Virtual Account that match the orderWhatever entitlement you have for the images. Nothing to sync if there is no list to sync
PlanPublic Validator address or name, NAT and firewall rules, DNSPrivate or documentation addresses, one flat transport, one reachable gateway
Certificate methodCisco PKI, or the enterprise CA if policy requires itAn enterprise CA, often a small one made for the lab
Edge listSync from the portal or upload a signed listAdd the lab routers by hand, or upload a short list
ResilienceMore than one Controller and ValidatorOne of each, with a snapshot of each before a risky change
BackupExport from the Manager and store it elsewhereA virtual machine snapshot is enough
The lab skips the account and resilience work, not the order or the certificates.
Diagram
Production and lab
Production and lab

Production adds accounts, resilient pairs of Controllers and Validators, and an edge list synced from the portal. The lab runs one of each, adds routers by hand and uses a snapshot as the backup. Both keep the same order and the same certificates.

ProductionMore than one of eachEdge list from the portal
LabOne of eachRouters added by hand
The lab removes the account and resilience work, and keeps the order and the trust.

Before step 3, the plan is worth checking against itself. A few typos in it do not show until a certificate or a control connection fails later. The table runs the lab values from the controller build lesson through four checks, then repeats two of them with a typo.

Diagram
A planning check on the lab values
A planning check on the lab values
Check on the planResultWhy it matters
Transport addresses distinct and in one subnetPass: 198.51.100.10, .11 and .12 in 198.51.100.0/24, with 251 of 254 usable addresses leftThe three nodes must reach one another on the transport side
System IPs distinctPass: 10.255.0.10, .11 and .12A duplicate identity is rejected or conflicts at the controllers
System IPs outside the transport subnetPass: 10.255.0.0/24 against 198.51.100.0/24Keeps the fabric identity apart from the transport address
Same organization name, exactlyPass: LAB-EXAMPLE on all threeA different name or capital letter is refused after the handshake
Typo: Validator system IP typed as 10.255.0.11Fails: two nodes share 10.255.0.11The same identity on two nodes
Typo: Validator organization name typed as lab-exampleFails: differs from LAB-EXAMPLE in caseCertificates carry the name, so every one would need issuing again
Worked out by script from the lab values in the controller build lesson, with two example typos added. The values are lab examples, not a plan for a production network.

Checking the result

Do not onboard a router until the controllers pass these checks. A pass here is cheap to confirm and a router that joins a half-built fabric produces symptoms that point at the wrong place.

Diagram
Checks after controller onboarding
Checks after controller onboarding
CheckCommand or screenWhat good looks like
Control connectionsshow control connections on each controllerEach controller shows the other two as up. Three pairs, each seen from both ends
CertificatesThe Certificates page in the Manager, and show control local-properties on a nodeStatus installed and a valid date range on all three
Root certificateshow certificate root-ca-cert on each nodeThe same root authority on all three
Edge listshow orchestrator valid-vedges on the Validator and show control valid-vedges on the othersThe WAN Edge devices you expect are listed as valid
Timeshow clock on each nodeAll three agree, and the dates fall inside the certificates' validity
Command names are the ones Cisco's certificate guide uses, and they differ in places between releases. Confirm each with the question mark at the prompt.
Diagram
What a failure at each check means
What a failure at each check means

No control connection points at reachability, identity or trust. A missing certificate points at the signing step. An empty valid list points at the edge list. A time difference points at NTP.

  1. No control connectionReach, org name or root certificate
  2. Certificate not installedSigning or install step not finished
  3. Valid list emptyEdge list not synced or not sent
  4. Clock differsFix NTP, then check certificate dates
Match the check to the gate it tests. The four gates are in the onboarding map.

Learn more: Device onboarding mapOnboard a WAN Edge with PnPValidatorManager

Test yourself on controller onboarding

Predict · scenario 1

A company wants its controllers built without anyone typing a configuration. Which option comes closest?

Predict · scenario 2

A Manager has no Internet access and the company does not want its own CA. Which certificate method fits?

Predict · scenario 3

The Validator and Controller are added to the Manager, but the Controllers page shows no certificate installed for them. Which step is unfinished?

Predict · scenario 4

Which step must come before any WAN Edge router is cabled to a site?

Predict · scenario 5

A plan lists system IPs 10.255.0.10 for the Manager, 10.255.0.11 for the Controller and 10.255.0.11 for the Validator. What does a check of the plan find?

Predict · scenario 6

The Manager is set to LAB-EXAMPLE and the Validator to lab-example. What is the likely result?

Predict · scenario 7

Which certificate method needs a workstation that can sign in to the PnP Connect portal?

FAQ

Do the Validator and the Controller need the Internet?
Not for their own operation. Whether a controller needs the Internet depends on the certificate method. Cisco's guide describes an automated Cisco PKI method that needs the Manager to reach Cisco's services, a manual Cisco PKI method for a Manager with no Internet and an enterprise CA method that stays inside the company. Check the current guide for the ports and names.
Can I change the organization name after the controllers have certificates?
It is better not to. The name is part of every certificate request and every device's identity, so a change means issuing the certificates again and touching every router. Settle the name before the first controller is built.
Is a lab onboarded in a different order from production?
No. The order is the same: Manager, then Validator, then Controller. The lab usually has one of each and a simpler certificate authority. A production design normally runs more than one Controller and Validator for resilience, which later lessons cover.