Three questions behind every failure
A control connection is a secure session, and it needs three things. The router has to reach the peer over the transport, so there must be a route, an allowed port and working DNS if a name is used. The router and peer must agree on who they are: organisation name, system IP and site ID, and on the router's authorisation in the Manager. And the certificates must be valid and trusted by both sides. Each class of failure has its own symptom, so read the state and error before changing anything.
Path, identity or trust.
- Pathroute, port,NAT, DNS
- Identityorg name,serial, site ID
- Trustcertificate,root CA, clock
Read the state first
The state column tells how far the handshake got. A state that stays at connect means the router is trying and nothing answers, which points to the path or the Validator address. A state that moves on to challenge or handshake and then falls back means the peer answered and then refused, which points to identity or certificates.
Two shapes of failure. A state that stays in connect means nothing answered, so the path is the first group to check. A state that moves on and then falls back means the peer answered and then refused, so identity and certificates come first.
| State seen | How far it got | Look first at |
|---|---|---|
| connect (stays) | No answer from the peer | Route, firewall, NAT, DNS, Validator address |
| challenge or handshake (then drops) | Peer replied, then refused | Certificates, serial authorisation, organisation name |
| tear_down (repeating) | Connection made and closed | Error code in connection history |
| up | Established | Nothing to fix here |
The connection history
BR-01#show sdwan control connection-history PEER TYPE PEER SYSTEM IP LOCAL COLOR STATE LOCAL ERROR REMOTE ERROR REPEAT vbond - biz-internet connect DCONFAIL NOERR 12 vsmart 10.255.0.11 biz-internet tear_down CRTREJSER NOERR 3 vmanage 10.255.0.10 biz-internet tear_down ORGNMMIS NOERR 3
The history for BR-01 has three lines. The Validator line shows DCONFAIL, which points at the path. The Controller line shows CRTREJSER, which points at serial authorisation or the certificate. The Manager line shows ORGNMMIS, which points at the organisation name.
- DCONFAILValidator lineno answer, check path
- CRTREJSERController lineserial or certificate
- ORGNMMISManager lineorganisation name
| Code | Meaning in plain words | Fix |
|---|---|---|
| DCONFAIL | DTLS connection failed; no usable answer | Check route, firewall, NAT and the Validator address |
| CRTREJSER | The peer rejected the challenge response, usually a certificate or serial problem | Authorise the serial in the Manager and check that both sides trust the certificate chain |
| CRTVERFL | Certificate verification failed | Check root CA chain, validity dates and clock |
| SERNTPRES | Serial number not present in the authorised list | Add or sync the device list |
| ORGNMMIS | Organisation name does not match | Copy the name exactly from the Manager |
| DISTLOC | The TLOC is disabled or not allowed to connect | Check tunnel interface and allowed services |
The order of checks
Path, then identity, then trust.
- Pathping the Validator
- Clockis time right?
- Identityorg, site, system IP
- Authoriseserial in Manager
- Certificatesroot and device
What to run at each step.
- Path to the Validatorping <validator> source <WAN interface>show ip route, and DNS if a name is used
- Clockshow clockCompare with the certificate dates
- Identity valuesshow sdwan control local-propertiesSystem IP, site ID, organisation name
- AuthorisationManager device list: is the serial valid?Hardware serial or virtual chassis number
- Certificatesshow sdwan certificate serialRoot CA installed? Device certificate present?
- Change one thing at a time, then wait for the next connection attempt before judging the result.
- Clear the repeat counter or note it, so you can tell if a new attempt really changed the error.
- If both the router and the controllers show errors, work from the router: its view of the path is the one that matters.
- A fresh bootstrap token or chassis number is a fix for an expired token, not for a path or clock fault.
Learn more: PKI, Root CA, Certificates and AuthorizationNAT Traversal, DNS and Firewall
Worked case: BR-02 after a long weekend
The lab branch BR-02 was powered off from Friday evening to Monday morning. After it starts, it connects to no controller. A ping from the WAN interface to the Validator at 10.255.0.12 works, so the path is fine, and nobody has changed the Manager. The connection history is the place to start.
BR-02#show sdwan control connection-history PEER TYPE PEER SYSTEM IP LOCAL COLOR STATE LOCAL ERROR REMOTE ERROR REPEAT vbond - biz-internet tear_down CRTVERFL NOERR 5 vsmart 10.255.0.11 biz-internet tear_down CRTVERFL NOERR 5 vmanage 10.255.0.10 biz-internet tear_down CRTVERFL NOERR 5
BR-02#show clock *00:12:41.208 UTC Mon Jan 1 2024
The device certificate in this example is valid from 10 February 2026 to 10 February 2027. Those dates are assumed for the lesson. Check the clock against the window before anything else.
| Router clock | Against 10 Feb 2026 to 10 Feb 2027 | Result |
|---|---|---|
| 1 Jan 2024, after the restart | 771 days before the start | Rejected as not yet valid |
| 7 Nov 2026, the correct date | Inside the window, 95 days left | Accepted |
| 11 Feb 2027, for comparison | 1 day after the end | Rejected as expired |
A slightly wrong clock may still pass verification. How much error is tolerated depends on where the correct date sits inside the window, and on the fast side that margin shrinks by a day every day until the certificate expires.
| Clock error | Router date | Result |
|---|---|---|
| 100 days slow | 30 Jul 2026 | Inside the window, 170 days after the start |
| 270 days slow | 10 Feb 2026 | First day of the window; the time of day decides |
| 300 days slow | 11 Jan 2026 | Rejected as not yet valid, 30 days before the start |
| 60 days fast | 6 Jan 2027 | Inside the window, 35 days left |
| 95 days fast | 10 Feb 2027 | Last day of the window; the time of day decides |
| 120 days fast | 7 Mar 2027 | Rejected as expired, 25 days after the end |
No controller connects after the restart, although the Validator answers a ping. Every peer shows the same error code. The clock is marked untrusted and is far in the past. The certificates are outside their window from the router's point of view, so the fix is a time source.
- SymptomNo controller connects after restartping to the Validator works
- PatternAll three peers show CRTVERFLsame repeat count
- Clockshow clock starts with an asteriskthe date is 771 days early
- CauseCertificates are outside their windowas the router sees it
- FixGive the router a time sourcethen wait for the next attempt
The repair is a time source. Point the router at an NTP server in its device template, or set the clock by hand in a lab if the platform allows it. Then wait for the next connection attempt rather than judging the result at once.
BR-02#show sdwan control connections PEER TYPE PEER SYSTEM IP LOCAL COLOR STATE UPTIME vsmart 10.255.0.11 biz-internet up 0:00:02:11 vmanage 10.255.0.10 biz-internet up 0:00:02:09
| What fails | Look first at | Why |
|---|---|---|
| Only a Validator line, stuck in connect | Path and the Validator address | The router has not learned where the controllers are |
| The Controller or Manager line only | That peer's reachability and authorisation | The Validator step worked |
| Every line, same code | The router's clock, certificate or organisation name | Each peer checks the same thing |
| One router out of many | That router's identity and authorisation | The other routers show the controllers are fine |
Test yourself
The Validator line stays in connect with DCONFAIL and a repeat count that keeps rising. What do you check first?
The router connects, then CRTREJSER appears. Which action fits?
A lab router's clock shows a date two years in the past. What is the most likely effect?
Every line in the connection history shows CRTVERFL with the same repeat count, and a ping to the Validator works. What do you check first?
show clock prints a time that starts with an asterisk and a date years in the past. What does the asterisk tell you?
One branch shows ORGNMMIS while the other 20 branches are up. What is the likely cause?
The lesson takes 7 November 2026 as the correct date, with a certificate valid from 10 February 2026 to 10 February 2027. A router's clock runs 120 days fast. What does the router do with the certificate?
Which observation points at the router itself, and not at one controller?
The clock on BR-02 has been corrected after CRTVERFL on every line. What is the next step?