A different router with the same onboarding order
A fabric that was built a few years ago can hold vEdge routers next to IOS XE ones, and the exam material still names both. The controllers do not care which software a WAN Edge runs, so the order is unchanged: controllers first, then the edge list, then the router. What changes is the command line, the discovery service and the status of the platform itself.
Both follow the same four gates. A Viptela OS router uses ZTP and its own commands. An IOS XE router uses PnP and the show sdwan commands.
| Gate | vEdge | IOS XE SD-WAN |
|---|---|---|
| Reach | Address on a VPN 0 interface, a default route, DNS if the Validator is a name | Address on a transport interface, a default route, DNS if the Validator is a name |
| Identity | System IP, site ID, organization name and Validator address in the system block | The same values, in the system block of a controller-mode configuration |
| Trust | Root certificate installed with a request command, if the controllers use an enterprise authority | The same step, with the request platform software sdwan form |
| Authorisation | The serial number or chassis number on the list the controllers check | The same list |
The ZTP flow for a vEdge
ZTP is the vEdge counterpart of PnP. The router has no configuration, finds its own way to a service that knows which Validator it belongs to, and then follows the same path as any other WAN Edge. The steps below are the flow as Cisco and Viptela document it, in plain order, and the details of each step are release dependent.
The router powers on with no configuration, takes an address by DHCP, asks the ZTP service for its Validator, connects to the Validator, then to the Manager and the Controller, and finally receives its configuration.
- Powerno config
- DHCPaddressand route
- ZTPfind theValidator
- Validatoridentitychecked
- ManagerandController
- Configtemplatepushed
| Step | What happens | What can stop it |
|---|---|---|
| 1 Power | The router boots a factory image with no configuration | A damaged image or a power fault. This is hardware, not onboarding |
| 2 DHCP | The router asks for an address on its interfaces and receives an address, a gateway and a DNS server | No DHCP service, no gateway, or a port that is not the one cabled for ZTP |
| 3 ZTP | The router resolves the name of the ZTP service and asks which Validator belongs to its serial number | No DNS, no Internet path, a firewall that blocks the request, or no entry for the serial number |
| 4 Validator | The router connects to the Validator, which checks its certificate and its place on the edge list, then tells it where the Manager and the Controller are | The device is missing from the list, the list was not sent, or the certificate chain does not match |
| 5 Manager and Controller | The router builds control connections to both, and the Manager sees it as a new device | A blocked port, a wrong clock, or a transport that the Controller cannot reach |
| 6 Config | The Manager pushes the template attached to the device | No template attached, or a variable left empty |
Before shipping, someone enters the device and the Validator address in the ZTP portal, someone adds the device to the edge list in the Manager and someone attaches a template. At the site, the installer connects power and an uplink that has DHCP.
The portal that holds the ZTP entry has changed over the life of the product, and the Cisco documentation for your release names the current one. For the portal side of the process, the PnP lesson lists the same preparation: account, profile, device entry. Read Onboard a WAN Edge with PnP for the pattern and the vEdge notes in the documentation for the exact screens.
Onboarding a vEdge by hand
When ZTP is unavailable, the router gets the same facts at the console. The block below is an example with documentation addresses and made-up identity values that are not part of the lab plan. Viptela OS uses a committed configuration, so nothing takes effect until the commit.
config
system
host-name VE-EXAMPLE
system-ip 10.255.9.1
site-id 109
organization-name "LAB-EXAMPLE"
vbond 10.255.0.12
!
vpn 0
interface ge0/0
ip address 192.0.2.40/24
tunnel-interface
encapsulation ipsec
color biz-internet
!
no shutdown
!
ip route 0.0.0.0/0 192.0.2.1
!
commit and-quitExample values only. The system block gives the identity, VPN 0 gives the transport path and the tunnel interface lets the router form control connections. Interface names, colours and the exact keywords vary by platform and release, so confirm each with the question mark.
| Step | What you do | Evidence it worked |
|---|---|---|
| 1 List | Make sure the router's serial number is on the edge list and valid, and that the list has been sent to the controllers | The Validator and the Controller show the device as valid |
| 2 Configure | Enter the system block and the VPN 0 transport, then commit | The router has an address and a route, and can reach the Validator |
| 3 Trust | If the controllers use an enterprise authority, install its root certificate chain before the first attempt | The router lists the root that signed the controllers |
| 4 Activate | A vEdge Cloud virtual router needs a chassis number and a token. A hardware vEdge uses its serial number and factory certificate | The router starts its control connections |
| 5 Verify | Read the control connections, then attach a template to the device | Connections up to the Validator, the Controller and the Manager |
The system block gives the identity: name, system IP, site ID, organization name and Validator address. VPN 0 gives the transport address and the default route. The tunnel interface lets the router form control connections. Nothing takes effect until the commit.
- SystemIDs, org name,Validator
- VPN 0interface anddefault route
- Tunnelcolor, IPsec,control links
- Commitnothing appliesbefore it
Production and lab
| Topic | Production | Lab |
|---|---|---|
| Which route | ZTP for sites that have Internet and DHCP, a console bootstrap in a depot for the rest | A console bootstrap, because a lab has no ZTP entry and often no Internet |
| Edge list | Uploaded or synced for many devices, then sent to the controllers | Added by hand for a few routers, then sent to the controllers |
| Trust | Cisco-signed or an enterprise authority, chosen with the controllers | A lab authority, with the root installed by hand on each router |
| Virtual routers | Uncommon in new designs. Check the lifecycle notice | Possible if the release still supports them. Use a chassis number and a token |
| Recovery | A spare router, a depot and a rollback plan | A snapshot of a virtual machine, or a factory reset of the router |
In production a vEdge uses ZTP where the site has Internet and DHCP, and a console bootstrap in a depot for the rest. In a lab it uses a console bootstrap, with the root certificate installed by hand on each router.
Commands side by side
| Purpose | vEdge (Viptela OS) | IOS XE SD-WAN |
|---|---|---|
| Control connections | show control connections | show sdwan control connections |
| Why a connection failed | show control connections-history | show sdwan control connection-history |
| Router identity | show certificate serial | show sdwan certificate serial |
| Install a root certificate | request root-cert-chain install <file> | request platform software sdwan root-cert-chain install <file> |
| Edge list on the Validator | show orchestrator valid-vedges | Same command, the controllers run Viptela-based software |
| Edge list on the Controller | show control valid-vedges | Same command |
If the router has no address, the problem is DHCP or the cable. If it has an address but no control connection, check DNS and the path to the ZTP service or the Validator. If it connects and is refused, check the edge list. If it connects and drops, check the clock and the certificate.
- No addressDHCP, cable, port
- Address, no ZTP answerDNS, Internet, firewall
- Connects, refusedEdge list not valid or not sent
- Connects, then dropsClock, certificate chain
Check the platform status first
A new design should start from the lifecycle notice and the compatibility table for the release in use. If a fabric still has vEdge routers, the plan usually includes replacing them with IOS XE SD-WAN routers, and the controllers can hold both families during the change. Read WAN Edge platforms for the comparison and WAN Edge show commands for the IOS XE side of the table above.
Read the lifecycle notice, check the compatibility table for the release in use, plan the replacement in waves, and let the controllers hold both router families during the change.
- Noticeend of salestatus
- Releasecompatibilitytable
- Wavesreplace a fewat a time
- Mixedboth familiescoexist
Replacement is easier to schedule when it is counted. The table below is an example plan, not a recommendation: 20 vEdge routers replaced with IOS XE SD-WAN routers in a pilot and three waves of growing size, at two cutovers a night. A wave of an odd size leaves one cutover slot empty on its last night, which is why the total is 11 nights and not 10.
| Wave | Routers | Nights at two a night | Nights so far | Still on vEdge |
|---|---|---|---|---|
| Pilot | 1 | 1 | 1 | 19 |
| Wave 1 | 3 | 2 | 3 | 16 |
| Wave 2 | 6 | 3 | 6 | 10 |
| Wave 3 | 10 | 5 | 11 | 0 |
Learn more: PnP/ZTP orchestration and prerequisitesOnboard a WAN Edge without PnPOnboarding verification and rollback
Test yourself on vEdge onboarding
A vEdge boots with no configuration and receives an address by DHCP, but does not reach its Validator. What do you check first?
A vEdge connects to the Validator and is refused. Its certificate is valid. What is the likely cause?
A runbook says show control connections. A router returns an error for it. Which software is the router most likely running?
A team plans to buy 20 new vEdge routers for next year's branches. What is the best first step?
A plan replaces 20 vEdge routers in waves of 1, 3, 6 and 10, at two cutovers a night. How many nights do the cutovers take in total?
In the manual vEdge example, the system block and VPN 0 have been typed at the console. When do they take effect?
A runbook for IOS XE SD-WAN says show sdwan certificate serial. What is the form for a vEdge in this lesson's table?