Three planes, three different failures
A dashboard that shows a red control connection invites a quick conclusion: the site is down. Often it is not, because three separate planes cooperate in the fabric and each can fail on its own. The management plane configures and watches. The control plane distributes routes, TLOC information, keys and policy. The data plane carries user packets over IPsec tunnels between edges. A fault in one plane has a specific, limited effect on the others.
The control plane carries routing information, policy and keys between the edge and the Controllers. The data plane carries user packets in IPsec tunnels between edges. The data plane runs on what the control plane delivered earlier, so it can keep working for a while after the control plane stops.
| Plane | Components | What it does | If it stops |
|---|---|---|---|
| Management | SD-WAN Manager | Templates, monitoring, software, certificates | No changes pushed and no dashboards; traffic is unaffected |
| Control | Controllers, Validator, OMP sessions | Routes, TLOCs, keys, policy, joining the fabric | New routes, policy and joins stop; held state keeps forwarding for a time |
| Data | WAN Edges, IPsec tunnels, BFD | Forwards user traffic | Traffic on that tunnel stops; BFD moves it in seconds |
What each failure takes away
The useful question about an outage is what is still working and what has stopped. The answer depends on which component or link failed and on how many edges it affects.
| Failure | Still works | Stops or degrades |
|---|---|---|
| Manager unreachable | Control connections, OMP routes, tunnels, user traffic | Template pushes, dashboards, software actions |
| Validator unreachable | Edges that are already connected, tunnels | An edge that restarts or drops its session cannot be introduced to the Controllers |
| One of two Controllers lost | Everything, through the other Controller | Redundancy: a second failure now removes the routing picture |
| All Controllers unreachable (every edge) | Tunnels and learned routes for the holding period | New routes, policy changes, new sites and key refresh; after the holding period the learned routes are removed |
| One edge cannot reach the Controllers | Its tunnels and learned routes for the holding period; other edges are unaffected | That edge hears no changes, and a restart does not recover it on its own |
| One tunnel fails between two edges | Other tunnels and paths | Traffic on that tunnel, which BFD moves within seconds |
A control connection alarm can mean a single edge has lost its path, every edge has lost the Controllers, only the Manager is affected, or a tunnel between two edges has failed. The first question is how many sites show the same alarm.
- One edgeits own pathor firewall
- Every edgeControllers orshared trust
- Manager onlymanagementplane
- One tunneldata plane,BFD handles it
The clock on a control outage
When an edge loses its Controllers it does not forget what it knows. It marks the learned routes stale and keeps using them while the holding period runs. During that time the tunnels stay up and BFD keeps checking them. The picture slowly ages, because nothing new can arrive, and when the holding period ends the edge removes what it held.
First the control connections drop. The edge marks the learned routes stale and keeps forwarding. While the holding period runs, new routes and policy changes are not heard. When the holding period ends, the edge removes the held routes and forwarding stops.
- Lostcontrolconnections drop
- Heldroutes stale,tunnels up
- Ageingnew routesnot heard
- Expiryheld routesremoved
Two consequences matter in an incident. Failures that need new information, such as a new destination or a changed policy, show up early and look partial: some traffic works and some does not. Failures that need the old information to expire show up late and look total: everything stops at once, long after the original fault. A team that stops looking once users report that everything works can be surprised by the second kind.
A failure that needs new information, such as a new destination or a changed policy, shows up early and looks partial. A failure that needs the held information to expire shows up late and looks total.
The holding period starts with the first failure, not with the first complaint. Where that deadline lands on the calendar matters as much as its length, because an outage that starts late in the working week runs out when few people are watching.
| Case | Outage starts | Holding period (assumed) | Held routes removed |
|---|---|---|---|
| The lesson's case, 12-hour timer | Mon 9 Nov, 08:55 | 12 hours | Mon 9 Nov, 20:55, evening |
| A short timer, 4 hours | Mon 9 Nov, 08:55 | 4 hours | Mon 9 Nov, 12:55, midday |
| Friday evening, 12 hours | Fri 13 Nov, 17:30 | 12 hours | Sat 14 Nov, 05:30, weekend night |
| Friday evening, 24 hours | Fri 13 Nov, 17:30 | 24 hours | Sat 14 Nov, 17:30, weekend afternoon |
| Friday evening, 48 hours | Fri 13 Nov, 17:30 | 48 hours | Sun 15 Nov, 17:30, weekend afternoon |
Prove which plane failed
Three commands on the affected edge answer three separate questions, and the combination tells you the scope. Control connections show the control plane. BFD sessions show the data plane. OMP routes show the routing picture the edge is using right now.
Show control connections tells you whether the control plane is up. Show BFD sessions tells you whether the tunnels carry traffic. Show OMP routes tells you which routing picture the edge uses, including routes that are held as stale.
- Control connectionsState up is healthyconnect or tear_down means the control plane is broken
- BFD sessionsState up means tunnels carry trafficLong uptime shows the tunnels did not move
- OMP routesS in the status means a held stale routeA missing prefix means a change was not heard
A worked case: the branch that was not down
At 09:10 the operations team opens a ticket: BR-04 is down. The dashboard shows both of its control connections as red and raises an alarm. The branch manager calls to say that most things work, but the new payment server at the data centre cannot be reached. That server network, 192.168.40.0/24, was added yesterday. The site had a firewall change at 08:55. Priya starts on the branch edge.
BR-04#show sdwan control connections PEER TYPE SYSTEM IP SITE ID LOCAL COLOR STATE UPTIME vsmart 10.255.0.11 1 biz-internet connect - vmanage 10.255.0.10 1 biz-internet connect -
BR-04#show sdwan bfd sessions | include 10.255.1.1 10.255.1.1 10 up mpls mpls 172.16.4.2 172.16.1.1 12346 ipsec 7 1000 9:02:14:51 10.255.1.1 10 up biz-internet biz-internet 203.0.113.40 198.51.100.20 12346 ipsec 7 1000 9:02:14:50
BR-04#show sdwan omp routes VPN PREFIX FROM PEER TLOC STATUS 10 192.168.10.0/24 10.255.0.11 10.255.1.1 mpls S,I,R 10 192.168.10.0/24 10.255.0.11 10.255.1.1 biz-internet S,I,R
The control connections are in the connect state, so the control plane is broken at this site. The BFD sessions are up with long uptime, so the data plane is healthy. The old prefix is held as stale and works. The new prefix is missing because the edge cannot hear new routes. The firewall change at 08:55 matches the time the connections dropped.
- ControlBoth peers in connect, no uptimeBroken at BR-04 only
- DataBoth BFD sessions up for nine daysTunnels did not move
- RoutesOld prefix held with S, new prefix missingPartial symptom explained
- CauseFirewall change at 08:55 matches the dropControl ports blocked from BR-04
Priya asks the site contact to review the 08:55 change. It blocked outbound traffic on the ports that the control connections use on the biz-internet transport. Common defaults are UDP 12346 for DTLS and TCP 23456 for TLS, but extra ports can be in use, so the site reads the actual values for the design. Once the rule is corrected the control connections come up and the edge relearns the routes.
BR-04#show sdwan omp routes VPN PREFIX FROM PEER TLOC STATUS 10 192.168.10.0/24 10.255.0.11 10.255.1.1 mpls C,I,R 10 192.168.10.0/24 10.255.0.11 10.255.1.1 biz-internet C,I,R 10 192.168.40.0/24 10.255.0.11 10.255.1.1 mpls C,I,R 10 192.168.40.0/24 10.255.0.11 10.255.1.1 biz-internet C,I,R
Report it with what is still working
An outage report that says only that a site is down sends the wrong people to the wrong place and hides how much time remains. A better note names the failing plane, says what keeps forwarding and for how long, and states what is needed to repair it.
| Line | For BR-04 | Why it matters |
|---|---|---|
| What is failing | Control connections to the Controller and Manager since 08:55 | Names the plane and the start time |
| What still works | Both tunnels and the routes learned before 08:55 | Tells users and managers that most traffic is safe |
| What changes next | New destinations stay missing; the held routes expire after the holding period | Gives the repair a deadline |
| What is needed | The site restores the control ports on biz-internet | Names the owner and the action |
A report that says the site is down hides that most traffic works and that a deadline is running. A report that names the plane, what still works and what changes next lets the right team act and tells users what to expect.
Learn more: Controller Certificate and Trust FailuresOMP Blackholes and TLOC ResolutionControl Connection DiagnosticsController HA and Failure Domains
Test yourself
The Manager has been unreachable for two days. Users report no problems. What is the most accurate statement?
An edge shows control connections in the connect state, BFD sessions up for days, and an old prefix marked S. A prefix added yesterday at the data centre is missing. What explains the pattern?
One of two Controllers fails. Every edge still has a control connection to the other one. What changes?
You want to know whether tunnels are carrying traffic at an edge whose control connections are down. Which command answers that?
Users report that everything works while the control outage is still unresolved. Why is it wrong to stop looking?
A control outage starts on Friday at 17:30, and the holding period is 12 hours. When are the held routes removed?
Which symptom of a control outage shows up late and looks total?
Five of 40 edges raise the same control connection alarm, and the other 35 are healthy. What is the first question?