Course contents

Unit 8: Management and basic policiesLesson 8.1 (1 of 6 in this unit)47 of 62 in the Cisco SD-WAN course

Manager workflows and change controls

Operating the Manager: the stages of a change, role-based access, the controls that limit a bad push, and where to look when a push goes wrong.

Intermediate · 10 min read

You'll learn to describe the normal path of a change in the SD-WAN Manager, name the controls that limit its risk, and say where to look when a change goes wrong.

Technical definition

Change control in the Manager is the set of habits and Manager features that surround a configuration change: role-based access to decide who may edit, a preview of what will be sent, a record of who did what, and a plan to check and undo the change. The Manager is the one place where a single click can reach every device, so these controls matter more than they do on a single router.

One click, many sites

On a single router, a wrong command affects one router. In the Manager (formerly vManage), a wrong template value can reach every router attached to it. The Manager is also the only place most of the fabric is configured from, so this lesson is about the habits that keep that power safe, not about a particular screen.

Diagram
Scope of a mistake
Scope of a mistake

One router against one template.

Single router CLITypo hits one deviceFix it with one login
Manager pushTypo hits every attached siteFix needs another push
Attachment, not typing, sets the blast radius.

The stages of a change

Whatever the screen is called in your release, a safe change has the same stages. Plan decides what and why. Build creates or edits the template, configuration group or policy. Preview shows what will be sent. Push sends it to a small first group, then to the rest. Verify checks the result with the same commands used before the change. Record writes down what happened.

Diagram
A change, start to finish
A change, start to finish

Plan, build, preview, push, verify, record.

  1. Planwhat, why, who
  2. Buildedit once
  3. Previewsee the diff
  4. Pushpilot first
  5. Verifysame checks
  6. Recordnote result
Verify and Record are the stages most often skipped.
  • Capture a baseline before the change: control connections, OMP summary and BFD summary on a pilot site, so that after the push there is something to compare.
  • Choose a pilot, such as one branch like BR-02, before the group that has the hub.
  • Decide in advance what result means success and what result means undo.

The preview stage is where most bad values can still be caught, but only if someone reads it. The table lists what to look for.

Diagram
What to read in a preview before you push
What to read in a preview before you push
QuestionWhy it matters
Is the changed line the one you meant?A typo in a variable looks the same as a correct value until it is read
Does the device count match your plan?A template attached to 40 sites reaches 40 sites, not the 5 you had in mind
Are there changed lines you did not touch?Another engineer's edit to the same template goes out with yours
Does the change touch a transport interface or a route?These are the changes that can cut a site off from the Manager
Two minutes here costs less than one cut-off site.

Who may do what

Role-based access control (RBAC) in the Manager assigns users to groups, and each group has read or write rights per area, such as templates, policies, monitoring and administration. The aim is that the person who watches the dashboard cannot edit a template, and the person who edits a template cannot create new users. Group names and rights are release dependent.

Diagram
Roles and what they should do
Roles and what they should do

A simple split of duties.

  1. Read-only operatorLooks at the dashboard, alarms and device statusNo edit rights
  2. Network engineerBuilds templates, groups and policiesMay preview and push in agreed windows
  3. AdministratorManages users, settings and controllersFew people, strong sign-in
Least privilege means each person gets only what the job needs.
Diagram
Controls and what each one protects against
Controls and what each one protects against
ControlProtects againstWhere it shows
RBACThe wrong person editingUser groups and rights (Administration area)
Configuration preview or diffPushing values you did not meanBefore the push, on the attach or deploy step
Pilot groupA problem reaching every siteYour own process, using device lists or tags
Audit logNot knowing who changed whatLogs in the Monitor or Tools area
Backup before the changeNo way backLesson on backups and lifecycle in this unit
Menu names vary by release. The controls are the same idea everywhere.

When a push goes wrong

Three outcomes cover most cases. The push is refused or stuck, because a device is unreachable or a value is invalid. The push succeeds but the device does not behave as intended, because the template was correct for a different site. Or the push succeeds and the device is cut off, for example by an interface or route change on the transport side. The third case is the dangerous one, because the Manager can no longer reach the device to fix it.

Diagram
Three ways a push fails
Three ways a push fails

Refused, wrong result, or cut off.

Change did not work
  • Not appliedunreachableinvalid value
  • Wrong resultright config,wrong site
  • Cut offtransport changed,control lost
Check device status in the Manager first, then the device.
  • For a push that did not apply, read the task status in the Manager and fix the named value or device.
  • For a wrong result, compare the pushed configuration with what the site needs, then correct the value for that site.
  • For a device that was cut off, the fix is on the device or through another path. Some releases can roll back a push when the router loses contact; check yours, and do not rely on it without testing.
  • Avoid pushing a change to transport interfaces to many sites at once. Push to one, confirm control connections stay up, then continue.

Worked example: the pilot that showed half the damage

A template change moves the MPLS gateway for 40 branches from 172.16.102.1 to 172.16.102.254, because the provider plans to move its gateways next week. Nobody has checked that the provider has done it yet. The plan names BR-02 as the pilot and records a baseline first. After the push, the pilot is compared with that baseline.

Diagram
BR-02 before and after the push (example values)
BR-02 before and after the push (example values)
CheckBaselineAfter the pushReading
Control connections up22Looks fine
OMP prefixes received77Looks fine
BFD sessions up42Stop
Transports with BFD upmpls and biz-internetbiz-internet onlyMPLS is lost
Two of the four rows say the push worked. The rows that do not are the ones a quick look would skip.
Example output written for this lesson, not a router capture
BR-02#show sdwan bfd sessions
10.255.1.1   10   up   biz-internet  biz-internet  203.0.113.20  198.51.100.20  12346  ipsec  7   1000   0:00:13:58
10.255.1.2   20   up   biz-internet  biz-internet  203.0.113.20  198.51.100.40  12346  ipsec  7   1000   0:00:13:57
Only the biz-internet tunnels to the two hubs are listed. The two MPLS tunnels are gone, because the new gateway does not answer yet. The Manager still reached the router over biz-internet, so it could push the old value back to the pilot and restore all four sessions.

The pilot was lucky in one way: it had a second transport. A site that reaches the Manager only over MPLS would have been cut off by the same push, and the fix would then have needed a visit or another path. Suppose that 6 of the 40 branches are MPLS-only. A push to all 40 would isolate 6 sites, which is 15 percent of the estate, and every one of them would need hands on site. Pick pilots by site pattern, not by convenience.

Diagram
One pilot for each site pattern
One pilot for each site pattern
Site patternWhat a transport change can doWhat the pilot shows
Two transportsTakes one transport down, the Manager still reaches the routerWhether the change breaks one transport (BFD count)
One transportCan cut the router off from the Manager entirelyWhether control connections survive, with someone ready to act
HubAffects every branch that tunnels to itHandle separately, one hub at a time, in its own window
A pilot tests only the pattern it belongs to. Cover each pattern before the group push.

The record of the change should say what was learned. A short note covers it.

Diagram
The change note for this case (example)
The change note for this case (example)
FieldEntry
Change and reasonMPLS gateway 172.16.102.1 to 172.16.102.254 in the branch template, for the provider's gateway move
Scope40 branches, pushed in three groups: pilot, 5 sites, the rest
BaselineControl connections 2, OMP prefixes 7, BFD sessions 4 on BR-02
Success checkThe same numbers after the push, with BFD on both transports
UndoPush the old gateway value, decided at the first check that fails
ResultPilot lost MPLS BFD, old value restored. Change on hold until the provider confirms the gateway move.
The result line is what the next engineer reads first.

Learn more: Configuration Deployment and Device AssociationsBackup, Change Windows and Lifecycle

Test yourself

Predict · scenario 1

You must change the default route in a template attached to 40 branches. What is the safest first step after previewing the change?

Predict · scenario 2

A read-only operator needs to watch alarms but should not be able to change a policy. Which control provides this?

Predict · scenario 3

After a push, a branch shows control connections down. The change touched its transport interface. What does this most likely mean?

Predict · scenario 4

After a pilot push, control connections and OMP prefixes match the baseline, but BFD sessions are 2 of 4. What do you do?

Predict · scenario 5

Why choose one pilot for each site pattern instead of the most convenient site?

Predict · scenario 6

Which parts of a change note let the next engineer decide when to stop and undo?

FAQ

Does the Manager have to be up for the network to keep working?
No. Data plane tunnels and existing routing keep running if the Manager is unreachable. What stops is configuration, new onboarding and fresh monitoring data. That is also why a bad push is the Manager's main risk: it is the one thing the Manager can do to a working network.
Is the menu layout the same in every release?
No. Menu names and positions move between releases, and newer releases add guided workflows. Learn the stages of a change, which stay the same, and find the matching screen in your release.
Why record changes if the Manager already logs them?
The audit log says who did what and when. It does not say why, or what you expected to see afterwards. A short note with a reason, a plan and a check is what lets the next engineer understand the change.